{"id":9041,"date":"2024-12-05T08:19:04","date_gmt":"2024-12-05T07:19:04","guid":{"rendered":"https:\/\/belectric.com\/?p=9041"},"modified":"2024-12-05T08:19:06","modified_gmt":"2024-12-05T07:19:06","slug":"belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania","status":"publish","type":"post","link":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/","title":{"rendered":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li>Commissioned of 114-megawatt solar farm near Borrentin in Mecklenburg-Western Pomerania, Germany<\/li>\n\n\n\n<li>Total capacity installed by BELECTRIC in Germany surpasses 1.2 GWp<\/li>\n<\/ul>\n\n\n\n<p><strong>Kolitzheim (Germany) \u2013<\/strong> <strong><strong>BELECTRIC, member of Elevion Group, has commissioned a 114-megawatt peak (MWp) solar farm for its customer, ENCAVIS, a leading independent producer of electricity from renewable energies. The completion of this large-scale plant in Mecklenburg-Western Pomerania, Germany, increases BELECTRIC\u2019s total installed capacity in Germany to over 1.2 gigawatts peak (GWp).<\/strong><\/strong><\/p>\n\n\n\n<p>BELECTRIC has successfully commissioned the Borrentin solar farm located in the German Mecklenburgische Seenplatte region. The photovoltaic system built for ENCAVIS will generate approximately 121 gigawatt-hours (GWh) of solar power annually, which will be used to supply energy to a network of electric vehicle charging stations. The rapid construction of this project demonstrates the exceptional collaboration between BELECTRIC employees on and off the construction site, the municipality of Borrentin, the landowner, and BELECTRIC\u2019s customer ENCAVIS.<\/p>\n\n\n\n<p>Thorsten Blanke, Managing Director of BELECTRIC, adds: \u201cWe are proud to have successfully commissioned this major project in Borrentin within such a short timeframe, thanks to the joint effort of our teams, our partner ENCAVIS, and all stakeholders. To date, we have installed over 1.2 GW of solar power in Germany. This means solar plants built by BELECTRIC across the country now provide a nominal capacity equivalent to that of a nuclear power station.\u201d<\/p>\n\n\n\n<p>Mario Schirru, CIO\/COO at ENCAVIS, comments: \u201cTogether with BELECTRIC, the municipality of Borrentin, and the landowner we have delivered this project, installing 200,000 solar modules across an area the size of 135 football fields. By overcoming challenges collaboratively, we have increased our wind and solar generation capacity in Germany to 700 MW, which brings us a significant step closer to our goal of achieving 7 GW of capacity connected to the grid across Europe by 2027.\u201d<\/p>\n\n\n\n<div class=\"wp-block-group has-primary-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-db32e940 wp-block-group-is-layout-constrained\" style=\"padding-top:var(--wp--preset--spacing--60);padding-right:var(--wp--preset--spacing--60);padding-bottom:var(--wp--preset--spacing--60);padding-left:var(--wp--preset--spacing--60)\">\n<h2 class=\"wp-block-heading has-base-color has-text-color has-link-color has-medium-font-size wp-elements-e8158687f9ef2b1792dbf9b4a419013a\">Downloads<\/h2>\n\n\n\n<p class=\"has-base-color has-text-color has-link-color wp-elements-b19aae85b0e70cf06b409c14aae64eb1\"><a href=\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/BEL_PR_2024-12-05_BELECTRIC-commissions-114-megawatt-solar-farm-in-Mecklenburg-Western-Pomerania.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Press release: BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania<\/a><\/p>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1440\" src=\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\" alt=\"Solar farm Borrentin viewed from above\" class=\"wp-image-9049\" srcset=\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg 1920w, https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-300x225.jpg 300w, https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-1024x768.jpg 1024w, https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-768x576.jpg 768w, https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-1536x1152.jpg 1536w, https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Kolitzheim (Germany) \u2013 BELECTRIC, member of Elevion Group, has commissioned a 114-megawatt peak (MWp) solar farm for its customer, ENCAVIS, a leading independent producer of electricity from renewable energies. The completion of this large-scale plant in Mecklenburg-Western Pomerania, Germany, increases BELECTRIC\u2019s total installed capacity in Germany to over 1.2 gigawatts peak (GWp). BELECTRIC has successfully&#8230;<\/p>\n","protected":false},"author":4,"featured_media":9049,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[178,11],"tags":[],"class_list":["post-9041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-en","category-press-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC<\/title>\n<meta name=\"description\" content=\"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company&#039;s total installed capacity in Germany now surpasses over 1.2 GWp.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"he_IL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC\" \/>\n<meta property=\"og:description\" content=\"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company&#039;s total installed capacity in Germany now surpasses over 1.2 GWp.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\" \/>\n<meta property=\"og:site_name\" content=\"BELECTRIC\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/belectric.solar\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-05T07:19:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-05T07:19:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Luisa M\u00fcller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u05e0\u05db\u05ea\u05d1 \u05e2\u05dc \u05d9\u05d3\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luisa M\u00fcller\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u05d6\u05de\u05df \u05e7\u05e8\u05d9\u05d0\u05d4 \u05de\u05d5\u05e2\u05e8\u05da\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 \u05d3\u05e7\u05d5\u05ea\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\"},\"author\":{\"name\":\"Luisa M\u00fcller\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/person\/3d137663dbac3856b7f4b9ef6d6759fd\"},\"headline\":\"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania\",\"datePublished\":\"2024-12-05T07:19:04+00:00\",\"dateModified\":\"2024-12-05T07:19:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\"},\"wordCount\":310,\"publisher\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#organization\"},\"image\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\",\"articleSection\":[\"General\",\"Press\"],\"inLanguage\":\"he-IL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\",\"url\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\",\"name\":\"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC\",\"isPartOf\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\",\"datePublished\":\"2024-12-05T07:19:04+00:00\",\"dateModified\":\"2024-12-05T07:19:06+00:00\",\"description\":\"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company's total installed capacity in Germany now surpasses over 1.2 GWp.\",\"breadcrumb\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#breadcrumb\"},\"inLanguage\":\"he-IL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"he-IL\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage\",\"url\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\",\"contentUrl\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg\",\"width\":1920,\"height\":1440,\"caption\":\"Bird's-eye view of the solar farm in Borrentin\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/belectric-dev.3wm.de\/he\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#website\",\"url\":\"https:\/\/belectric-dev.3wm.de\/he\/\",\"name\":\"BELECTRIC\",\"description\":\"360\u00b0 solution for ground-mounted solar power plants\",\"publisher\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/belectric-dev.3wm.de\/he\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"he-IL\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#organization\",\"name\":\"BELECTRIC\",\"url\":\"https:\/\/belectric-dev.3wm.de\/he\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"he-IL\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2023\/09\/belectric_member_logo_rgb.svg\",\"contentUrl\":\"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2023\/09\/belectric_member_logo_rgb.svg\",\"width\":805,\"height\":100,\"caption\":\"BELECTRIC\"},\"image\":{\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/belectric.solar\/\",\"https:\/\/www.xing.com\/pages\/belectric\",\"https:\/\/www.linkedin.com\/company\/belectric-gmbh\/\",\"https:\/\/www.instagram.com\/belectric_solar\/\",\"https:\/\/www.youtube.com\/@BELECTRIC_GmbH\/videos\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/person\/3d137663dbac3856b7f4b9ef6d6759fd\",\"name\":\"Luisa M\u00fcller\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC","description":"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company's total installed capacity in Germany now surpasses over 1.2 GWp.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"he_IL","og_type":"article","og_title":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC","og_description":"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company's total installed capacity in Germany now surpasses over 1.2 GWp.","og_url":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/","og_site_name":"BELECTRIC","article_publisher":"https:\/\/www.facebook.com\/belectric.solar\/","article_published_time":"2024-12-05T07:19:04+00:00","article_modified_time":"2024-12-05T07:19:06+00:00","og_image":[{"width":1920,"height":1440,"url":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg","type":"image\/jpeg"}],"author":"Luisa M\u00fcller","twitter_card":"summary_large_image","twitter_misc":{"\u05e0\u05db\u05ea\u05d1 \u05e2\u05dc \u05d9\u05d3":"Luisa M\u00fcller","\u05d6\u05de\u05df \u05e7\u05e8\u05d9\u05d0\u05d4 \u05de\u05d5\u05e2\u05e8\u05da":"3 \u05d3\u05e7\u05d5\u05ea"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#article","isPartOf":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/"},"author":{"name":"Luisa M\u00fcller","@id":"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/person\/3d137663dbac3856b7f4b9ef6d6759fd"},"headline":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania","datePublished":"2024-12-05T07:19:04+00:00","dateModified":"2024-12-05T07:19:06+00:00","mainEntityOfPage":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/"},"wordCount":310,"publisher":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/#organization"},"image":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage"},"thumbnailUrl":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg","articleSection":["General","Press"],"inLanguage":"he-IL"},{"@type":"WebPage","@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/","url":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/","name":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania - BELECTRIC","isPartOf":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/#website"},"primaryImageOfPage":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage"},"image":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage"},"thumbnailUrl":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg","datePublished":"2024-12-05T07:19:04+00:00","dateModified":"2024-12-05T07:19:06+00:00","description":"BELECTRIC has commissioned the 114 MWp solar farm Borrentin. The company's total installed capacity in Germany now surpasses over 1.2 GWp.","breadcrumb":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#breadcrumb"},"inLanguage":"he-IL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/"]}]},{"@type":"ImageObject","inLanguage":"he-IL","@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#primaryimage","url":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg","contentUrl":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2024\/12\/Solarpark_Borrentin-scaled.jpg","width":1920,"height":1440,"caption":"Bird's-eye view of the solar farm in Borrentin"},{"@type":"BreadcrumbList","@id":"https:\/\/belectric-dev.3wm.de\/he\/belectric-commissions-114-megawatt-solar-farm-in-mecklenburg-western-pomerania\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/belectric-dev.3wm.de\/he\/"},{"@type":"ListItem","position":2,"name":"BELECTRIC Commissions 114-Megawatt Solar Farm in Mecklenburg-Western Pomerania"}]},{"@type":"WebSite","@id":"https:\/\/belectric-dev.3wm.de\/he\/#website","url":"https:\/\/belectric-dev.3wm.de\/he\/","name":"BELECTRIC","description":"360\u00b0 solution for ground-mounted solar power plants","publisher":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/belectric-dev.3wm.de\/he\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"he-IL"},{"@type":"Organization","@id":"https:\/\/belectric-dev.3wm.de\/he\/#organization","name":"BELECTRIC","url":"https:\/\/belectric-dev.3wm.de\/he\/","logo":{"@type":"ImageObject","inLanguage":"he-IL","@id":"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/logo\/image\/","url":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2023\/09\/belectric_member_logo_rgb.svg","contentUrl":"https:\/\/belectric-dev.3wm.de\/wp-content\/uploads\/2023\/09\/belectric_member_logo_rgb.svg","width":805,"height":100,"caption":"BELECTRIC"},"image":{"@id":"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/belectric.solar\/","https:\/\/www.xing.com\/pages\/belectric","https:\/\/www.linkedin.com\/company\/belectric-gmbh\/","https:\/\/www.instagram.com\/belectric_solar\/","https:\/\/www.youtube.com\/@BELECTRIC_GmbH\/videos"]},{"@type":"Person","@id":"https:\/\/belectric-dev.3wm.de\/he\/#\/schema\/person\/3d137663dbac3856b7f4b9ef6d6759fd","name":"Luisa M\u00fcller"}]}},"_links":{"self":[{"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/posts\/9041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/comments?post=9041"}],"version-history":[{"count":6,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/posts\/9041\/revisions"}],"predecessor-version":[{"id":9146,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/posts\/9041\/revisions\/9146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/media\/9049"}],"wp:attachment":[{"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/media?parent=9041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/categories?post=9041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/belectric-dev.3wm.de\/he\/wp-json\/wp\/v2\/tags?post=9041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}